Friday, June 22, 2012

job creator


 finally some tangible work being performed by real humans.  footings poured and block laid, you can see the beginnings of floor framing in these pictures.  having working drawings to reference helps me visualize where these pillars and turns are on the floorplan. 

 i arrive LIH in ten days, currently planning to make the most of the week i will be there (minus fourth of july).  even if framing is not up (which i doubt it will be), if the level floor is down (or, up, as it were), it will help shoot the views and angles of the windows and room scale.


behind bedroom three

bedroom three exterior "hallway"

footings

he's straddling MBR and MBA

MBR southwest corner

No comments:

Post a Comment