Friday, June 8, 2012

funded!


i thought this day would never come.  the bank loan is recording today and the subsequent funding of bond allows us to buy stuff and do stuff.  finally.  the six-month delay has me and the builder deep in debt.  in order to keep the project going, we have been paying trades directly.  the funded bond will now allow us to pay ourselves back.

 i've decided to upgrade the non-sliding windows throughout from vinyl to aluminum or fiberglass.  i've had a bad feeling on vinyl and do not want any failures or quality issues when i'm not there to address it or even see it.  the other reason is aesthetic.  vinyl only comes in white or tan, and aluminum allows an anodized bronze finish, exactly like the san diego house.  this will increase the cost from the contract and begin a new specification process.

 materials have started to arrive at the site.  the builder placed orders to coincide with a regular construction schedule, but that got thrown off considerably by lack of funding (see above).  this is bad in that the materials are sitting on site doing nothing, but also good in that when it's time to employ those materials, there is no delay.

 with funding cleared, i should be posting more often now.



trench for control wires to front gate

concrete in the ground


from the garage area looking south

nobody escapes the matrix

wood waiting
stacked materials
footings poured