Mobilize


 Spring has sprung and the torrent of rain has subsided.  the earth was deemed dry enough to schedule the excavators and ditch-digging equipment.  after many years of planning, drawing, visualizing, permitting, public hearings, negotiating, grubbing, faxing, politicking, re-grouping, estimating, waiting and hoping..  ground was broken this week.  since the bank is still shuffling papers and there's no indication of when the loan will fund, the builder is starting on utilities, trenching, septic and leach-field earth work outside of the house footprint.  direct work on the structure is, technically, prohibited until the loan funds.

 Never has a pile of red dirt looked so good. 