Some documents and checks have flowed out of san diego to HI, and the planning for job-start continues. the general has started to schedule earthwork subs for site work and engineering. a dust fence is going up this week to protect views and flying dust/dirt to the neighbors on either side. the fence is twelve feet high and is run along the north and south edges of the property. along those edges, tree trimming has commenced and an entire eucalyptus tree along the north edge has been removed.
a tree taller than all of these has been removed |
Larger, more house-centric activities are on hold until the bank underwrites and funds the loan in process. working with FHB has been a test of what i thought was my abundant supply of patience. it has been two months of paperwork, documents, waiting, re-copying, re-submitting, clarifying, and waiting some more. there is no sense of urgency from the bank, even though there is a crew of guys behind the general waiting to get to work. in the time between submitted loan application late last year and today, i've completely re-financed, and closed, the primary mortgage on the san diego house.
No comments:
Post a Comment