Monday, April 22, 2013
Saturday, April 13, 2013
best. trip. ever.
we addressed the copper "coffee cans" that transition the downspouts to the ipe columns on the lanai. they will be replaced by something lower profile. i hope. other copper numbers came in for the porte cochere columns and we are in the ballpark, though there is some light concern over adhesive.
we came to consensus on the front steps. sort of. they will be slate and return back to die into the columns. the south side will extend several feet for a bench and a place for shoes, etc. at least that's the idea. there's isn't a lot of room for the steps because the porte cochere drive-through is pretty wide, and that's a good thing.
![]() |
| light gray is slate, dark gray is interior (also slate), brown is columns |
i hope the closet shelves function as good as they look. my designs are rudimentary, but the physical manifestations of them are impressive.

we went with rolling shades only on the sliding bedroom doors. i need to order these soon. other shades will be decided after spending time in the house and sleeping at various times of the year.
| sliding door shades in Hadrian Wall blackout fabric |
the LED light coves in living and master are underway. we mocked up a few designs and finalized dimensions and details. a light sanding of the first cedar board at the east wall acts as a poor-man's diffuser in the living room. master coffers are more traditional frames with tilted shelves for the LED tape. porte cochere rope light cove is already complete and looks good.
built-in (cantilevered, really) shelving has been designed and dimensions finalized. all shelves are in twos: office and master tub have a 75% offset from bottom-to-top, guest baths are parallel, and the mirrored bar has about 10" of overlap.
next trip is move-in, so to speak. mid-may i plan to sleep in the house and begin to accept furniture deliveries and houseware shipments. famous last words.
| me & bleu at smalltown coffee in kapaa |
Friday, March 8, 2013
Sunday, February 17, 2013
finish line
| take it from the ground up |
cabinets are going into place. i found this is the only area where i'm afraid/worried seeing them being unpacked and set into place. it's like i forgot something, or there will be trouble with something not fitting into place. fortunately, the crew is fantastic and no speed bump seems to slow them down.
tile design is done, tile is on-site, and will be installed this week and next as it goes down on the floor and up on the walls. i helped the tile guy bring into the house boxes of tile and counted it as a workout because they were f!cking heavy. we unpacked and they all look great. the pattern repetition of Dal Steel Structure is a bit disappointing, but the tile guy says he can make it work.
the dryvit is done and the lighter color looks good. i treated it like a ceiling and deferred to architect and builder for a recommendation from a subset of colors i picked. it's smooth finish tightens up the exterior lines of the eaves, porte cochere and all corners.
work has started on the replacement fleetwoods. i lost the buyer for one of the three old doors, so i'm back to storing three beautiful aluminum sliding doors in the garage. (anyone interested?) i'm looking forward to seeing and operating the new doors.
a stopover on oahu to pick guest bath surfaces out of existing remnants of old jobs was wildly successful. had a great ride up to kailua where fabrication facility is. found a nice, pre-laminated piece of caesarstone (same quartz as rest of house) in "pebble". it took about 45 seconds to find. the rest of the time i played with George, a dog who will lose his hearing way before other dogs his age from the wet saws and CNC machine blasting non-stop.
| Winner! Caesarstone "pebble" |
| the ride back from Kailua |
aloha!